Facility Management

Integrated service management is the key to work backlog management.
Having advanced maintenance planning, scheduling and compliance tools like the award winning Visual Planner™ enables Operations and Maintenance Managers to have direct line of sight to the maintenance priorities of the day without losing focus or view of the long term work plans.
Visual Solutions for Smarter Facility Management automates the work management process.
By merging asset health and production event data with maintenance readiness information Facilities Operations and Maintenance managers and workers will have real-time visibility to their facility and plant environment. With this trusted and transparent asset / resource state data they can make informed decisions to achieve OEE and extend the asset lifecycle of their revenue generating assets.
Visual Solutions for Smarter Facility Management is an embedded configuration of IBM Maximo® for Asset Management applications that simplify and automate the planning & scheduling and assignment processes related to breakdown, predictive, preventive and autonomous program maintenance and regulatory compliance requirements within facilities management and plant service operations.
Using Visual Calendars, Smart Resource Leveling and Visual Scheduler factory maintenance managers can effectively track, monitor and manage the maintenance, overhaul and repair of strategic production assets.
Leveraging IBM Maximo’s integration readiness for I/O with GIS systems, CAD, engineering instrumentation, asset health / monitor technologies and meter reading from handhelds, the Maximo Business Objects (MBO) transform digital data into vital asset information used to trigger condition monitoring alerts, initiate workflow processes and generate meter-based work orders.
CiM’s Visual Planner Suite extends the power of IBM Maximo® Preventive Maintenance, Work Order Tracking Calendar and Assignment modules to enable Manufacturing Operations and Maintenance personnel to deploy Total Productive Maintenance (TPM) practices to achieve Overall Equipment Efficiency (OEE).
Smart Calendars will have identified the availability of labor resources, shop work assets and production location availability. Smart Resource Leveling will qualify craft availability, labor qualification, work type, work order priority, asset criticality, production priority and compound resource loads to automatically assign the work order. Smart Schedule will associate this qualified event / work with the entire work order backlog to balance, sequence and deploy the work order in a manner consistent with your Standard Operating Procedures (SOP) and established weekly production priorities.
Features
- Feature rich ‘smart’ applications fully constructed in IBM Maximo® solution architecture
- Embedded process logic for end to end production / maintenance planning, scheduling and control
- Ergonomically correct visual calendar views with drag & drop, single-click, mouse-over, button activation
- Seamless interoperability with Maximo® Scheduler, product lifecycle and process automation systems
- Leverages Maximo Integration ready for I/O with process instrumentation, asset health / monitor technologies
- User configurable preference settings for real-time operations and strategic scenario development modes
Advantages
- Service-free implementation, administrator ready configuration for simple deployment and support
- Visual solutions simply and accelerate the transformation of machine data into trusted asset information
- Visualization of location, asset & labor / crew availability accelerated decision support and response time
- Integrated scheduling and asset monitoring data is centralized and controlled within IBM Maximo
- Federate, harmonize and standardize planning, scheduling and assignment of work processes
- Smart rules–based applications drive high integrity asset management decision support and analytics
Benefits
- Built-in Maximo applications provide safe, secure, single-point-of truth enterprise asset information
- Fully automate TPM processes for superior governance, risk and compliance management capability
- Enhanced planning & scheduling reduces downtime, extends uptime, quality, and capacity
- Full asset lifecycle planning & scheduling enhances program forecasting, cost accounting and control
- Defined processes and transparency ensure OEE measurement is accurate, accessible and reliable
- Trusted asset information analytics increases OEE, extends asset lifecycle and reduces operating costs,
Smarter Facilities Managers are focused on leveraging visual solutions. They understand that conserving, controlling and reusing human and electronic energy is the only way to operate/maintain safe, pristine and profitable manufacturing environment. Visual Planner is currently available in a wide range of languages for all patches and releases of Maximo version 5, 6 and 7.
Links:
FM MUG: http://www.fmmug.org
IBM Smart Sensors: http://www-01.ibm.com/software/solutions/sensors/